A section of the NHRR falls within a Source Protection Zone 2 (SPZ2), where infiltration drainage posed a risk to public water supplies. The goal was to allow sustainable drainage without compromising groundwater quality.
Our Approach
Courous Ltd developed a multi-layered pollution mitigation strategy aligned with HEWRAT, LA113, and CIRIA SuDS guidance.
Key Measures:
🌀 Vortex separators for removing hydrocarbons and metals
🌱 Sediment forebay and grass channels for natural filtration
🛑 Penstock valves for emergency shut-off during spills
📊 HEWRAT and spillage risk assessments demonstrating compliance
🧪 Ground investigation confirming low permeability and no groundwater within 10m
Outcome
Infiltration drainage approved within SPZ2
Pollution risks mitigated to “acceptably low” levels
Fully compliant with EA and groundwater protection policies
Sustainable, maintainable, and resilient design
This project highlights Courous Ltd’s capability to deliver compliant drainage solutions in sensitive groundwater zones, balancing environmental protection with practical design.