Drainage Strategy Blacko, Lancashire

Drainage Strategy Blacko, Lancashire

20 Plot Housing Development

Location

Blacko, Lancashire

Service

Drainage Strategy, 20 Plot Housing Development

Completion Date

August 2025

Status

Project Overview

Classic Architecture proposed a new residential development at Blacko, Lancashire , consisting of a mix of detached and semi-detached dwellings with associated garages, landscaping, and a new access road. As part of the planning process, a robust surface water drainage strategy was required to demonstrate compliance with national and local planning policies and ensure resilience against long-term flood risk.

Challenges & Approaches

Challenge

The site lies within Flood Zone 1, indicating a low probability of river or sea flooding. However, the presence of impermeable clay soils and the site’s sloping topography (falling 19.79m across the plot) posed challenges for surface water management. The nearby open watercourses, which flow into Pendle Water, raised the need for controlled discharge, and the strategy had to accommodate climate change and urban creep allowances.

Approach

Courous Ltd. developed a detailed drainage strategy which included:

  • Review of local planning policy and SuDS discharge hierarchy

  • Soilscapes data analysis to assess infiltration potential

  • Calculation of greenfield runoff rate (5.77 l/s) using UKSuDS tools

  • Design of attenuation infrastructure to accommodate a 1 in 100-year storm + 50% climate change allowance

  • Incorporation of SuDS features such as permeable paving, rain gardens, and rainwater reuse options

  • Preliminary network modelling using InfoDrainage software

  • Two discharge outfall options identified subject to survey confirmation and regulatory approvals

Outcome

The strategy confirmed:

Conclusion

The drainage strategy provided a sustainable and policy-compliant solution tailored to the site’s physical and environmental constraints. It ensured long-term resilience to climate change while minimising flood risk to the development and surrounding area. The report supported the planning application and set the foundation for a detailed design phase, subject to further survey and permitting.