gray asphalt road between green grass field under blue sky during daytime

NHRR Source Protection Zone

Groundwater Protection & Drainage Strategy in SPZ

Location: Lincolnshire
Project: North Hykeham Relief Road – Catchment 10
Focus: Groundwater Protection in SPZ2

The Challenge

A section of the NHRR falls within a Source Protection Zone 2 (SPZ2), where infiltration drainage posed a risk to public water supplies. The goal was to allow sustainable drainage without compromising groundwater quality.

Our Approach

Courous Ltd developed a multi-layered pollution mitigation strategy aligned with HEWRAT, LA113, and CIRIA SuDS guidance.

Key Measures:

  • πŸŒ€ Vortex separators for removing hydrocarbons and metals

  • 🌱 Sediment forebay and grass channels for natural filtration

  • πŸ›‘ Penstock valves for emergency shut-off during spills

  • πŸ“Š HEWRAT and spillage risk assessments demonstrating compliance

  • πŸ§ͺ Ground investigation confirming low permeability and no groundwater within 10m

Outcome

βœ… Infiltration drainage approved within SPZ2
βœ… Pollution risks mitigated to β€œacceptably low” levels
βœ… Fully compliant with EA and groundwater protection policies
βœ… Sustainable, maintainable, and resilient design

This project highlights Courous Ltd’s capability to deliver compliant drainage solutions in sensitive groundwater zones, balancing environmental protection with practical design.