NHRR Source Protection Zone

NHRR Source Protection Zone

Groundwater Protection & Drainage Strategy in SPZ

Location

Lincolnshire

Project

North Hykeham Relief Road – Catchment 10

Focus

Groundwater Protection in SPZ2

Status

Challenges & Approach

The Challenge

A section of the NHRR falls within a Source Protection Zone 2 (SPZ2), where infiltration drainage posed a risk to public water supplies. The goal was to allow sustainable drainage without compromising groundwater quality.

Our Approach

Courous Ltd developed a multi-layered pollution mitigation strategy aligned with HEWRAT, LA113, and CIRIA SuDS guidance.

Key Measures:

  • 🌀 Vortex separators for removing hydrocarbons and metals

  • 🌱 Sediment forebay and grass channels for natural filtration

  • 🛑 Penstock valves for emergency shut-off during spills

  • 📊 HEWRAT and spillage risk assessments demonstrating compliance

  • 🧪 Ground investigation confirming low permeability and no groundwater within 10m

Outcome

This project highlights Courous Ltd’s capability to deliver compliant drainage solutions in sensitive groundwater zones, balancing environmental protection with practical design.